GENERATION CONNECTION CAPACITY ASSESSMENT OF THE 2024 TRANSMISSION NETWORK (GCCA – 2024)

GENERATION CONNECTION CAPACITY ASSESSMENT OF THE 2024 TRANSMISSION NETWORK (GCCA – 2024)

ABSTRACT
The launch of the renewable energy independent power producer procurement programme (REIPPPP) attracts a large number of applications from independent power producers (IPPs) for connection to the Eskom grid.
This report, details the available generation connection capacity of the 2024 transmission network with all the projects that are expected to be commissioned by then. This report details the available generation connection capacity for the entire country, and it was compiled per supply area namely; Kwa-Zulu Natal, Mpumalanga, Pelly, Gauteng, Limpopo, North West, Free State, Northern Cape,Western Cape, Hydra Cluster and Eastern Cape.